Field notes

What we end up explaining on the phone, written down. No price predictions, no payback promises — just the parts of this business that cost money to learn the hard way.

Operations 8 min read

Commissioning a first rack: the week nobody plans for

The pallet has arrived. What to do in the first hours, the first day and the first week — from unpacking checks to burn-in, pool configuration and the baselines you will want six months from now.

Read the note →
Fundamentals 8 min
Modelling payback without fooling yourself

Every ROI calculator online is optimistic by construction. How to build one that is not — the variables that move, the ones people forget, and what a defensible model looks like.

Read →
Infrastructure 7 min
Power planning: why 3.5 kW is never 3.5 kW

Breakers, phases, inrush and derating. The electrical homework that decides how many miners a site can actually hold — and the mistakes that trip a rack on its first hot afternoon.

Read →
Infrastructure 8 min
Hydro miners: what the loop actually costs you

Liquid-cooled units offer the best efficiency on the market and the most infrastructure you have ever had to build. A plain account of what sits between a hydro machine and a working rack.

Read →
Fundamentals 7 min
J/TH, explained properly: the number that decides everything

Efficiency is the one specification that keeps mattering after the purchase. What joules per terahash actually measures, how to convert it into a monthly bill, and why the most efficient machine is not always the right buy.

Read →
Buying 6 min
Why one miner is sold as "202–226 TH/s"

Hashrate bins are not a typo or a hedge. Here is how chip binning works, what it means for the unit that arrives on your pallet, and what to insist on before you wire money.

Read →